NCTC was awarded a Project Abu Dhabi International Airport South Airfield Development

NCTC was awarded a Project Abu Dhabi International Airport South Airfield Development

Wed 01 May 2013

The scope of work was comprised of complete rehabilitation of South Runway 13R-31L, new taxiways in between threshold 13R, new Airfield Ground Lighting system which will be connected to the existing AGL Infrastructure and substations where new CCR’s will be installed as required. A complete runway strip up to 160m from the centerline of the runway in both north and south directions was re-graded and provided with a surface protection layer. They made also new drainage line located within the northern strip, east of existing cross taxiways G and H and new drainage system within the runway. Replacement of new cabling, transformer, addressable control units and CCR’s applicable to the existing AGL substation was also included in the scope of work for the above project.