14 June 2015

NCTC Awarded Project R 801/1 – Roads in Al Barsha South 1 & 2 by the Roads and Transport Authority (RTA)

The scope of work comprised the construction of roads in Al Barsha South 1 and 2, including tree removal, site clearing, ducts, and drainage works, along with the diversion of a DEWA power line. The total length of roads constructed reached approximately 59.3 km, consisting of 10.82 km of collector roads and 48.37 km of major and minor access roads. The project also included roadway signage, pavement marking, street lighting, traffic signals, intersections with existing roads, and a minor storm water drainage system.