Client Ministry of Public Works
Status Completed
Category Road and Bridge Projects
Location Ajman
Duration 14 months

➢ Construction of New Internal Roads. The length is approximately 26.788 kms. In various single and double carriageways, all in four areas (A, B,C and R1). In detail, the following are the length of road for each area: Area A= 1.551km, Area B = 2.384km, Area C=20.986km and R1 = 1.867 km.
➢ Earthworks, Roads and Paving.
➢ Works for FEWA Water. Precast reinforces concrete protection slabs places over existing pipes, including excavation, backfilling and reinstatement as per FEWA standards. Supply, delivery, excavation, laying, installation and backfilling of PVC pipe as future service ducts. Disconnect existing water lines to be relocated, excavated new trenches, supply and lay new HDPE & PVC pipe on new trench as designated for relocation of existing AC pipe water lines, inclusive with all bends and connection accessories, beds and surrounds and backfilling with all related works complete in accordance to specifications and FEWA standards.
➢ Works for FEWA Electricity Division. Carefully locate power cables that need protection, excavate and protect with precast reinforced concrete protection slabs places above existing power supply cables, reinstatement and with all related works complete as directed by the Engineer and in accordance with FEWA standards. Provide 150mm UPVC future services ducts in trenches. All works inclusive of excavation and backfilling of trenches, reinstatement and all related works complete in accordance to specification and FEWA standards.
➢ Works for Etisalat. Carefully excavate, expose, clean and prepare existing Etisalat cable ducts with concrete encasement including backfilling and reinstatements of the finish surface. Disconnect existing lines to be relocated, excavated for new cable trenches, removal of surplus material to tip, provide required beds and surrounds lay new Etisalat cables on new trench as designated, backfill and reconnect with existing Etisalat cables inclusive of all related works complete in accordance to specifications and Etisalat standards.
➢ Storm Water Drainage and Road Lighting.