Client Sharjah Airport Authority
Status Completed
Category Airport Projects
Location Sharjah
Duration 26 months

➢ Drainage Works comprising of catch pits, pipes, soak-aways and erosion protection.
➢ Earthworks and pavements including polymer modified bituminous binder and wearing courses. Surface protection to the runway strip and pavement marking.
➢ Pits and ducts for airfield ground lighting, power supply and communications networks including secondary ducts to inset lights in pavements.
➢ Foundations for airside equipment installations and construction of airside roads.
➢ Construction of Two Sub-Station Buildings. Main and Standby Power Systems complete in each of two sub-stations, including internal 11kv power distribution equipment, power factor correction equipment, standby generators, bulk fuel storage and distribution system, uninterruptible power system, LV power distribution equipment, system earthing and lighting protection installations.
➢ Communication Network Complete, including two individual fibre optic ring circuits (NAV-B & MET-C) and single multi-core, copper ring circuit.