Client RTA Dubai
Status Completed
Category Road and Bridge Projects
Location Dubai
Duration 18 months

➢ Construction of Roads in Al Barsha South 1 and 2 (Community 671 & 672) .The removals of trees, clearing of the site, ducts and drainage works, and the diversion of DEWA power line are included in the works.
➢ Total length of roads constructed is approximately 59.3km consisting of 10.82 km collector roads and 48.37km of major/minor access roads.
➢ Intersections with existing roads are included in the work. One signalized intersection along the Secondary Arterial Road at Road 136E and various minor intersections and roundabout within the site.
➢ Project also includes the construction or roadway signage (overhead and ground mounted) and pavement marking, street lighting and traffic signals, ducting for betterment works for Services Authorities and minor storm water drainage system.