Client Abu Dhabi Airports Company
Status Completed
Category Airport Projects
Location Abu Dhabi
Duration 8 months

➢ Storm Drainage Network Pipes. Supply and install UPVC Pipes, curb inlet.
➢ Irrigation Pipeline – Supply and install PVC and HDPE pipes.
➢ Relocate Existing Lighting Poles, lighting cables and Electrical Boards.
➢ Remove and Salvage Lighting Cables
➢ Relocate existing medium voltage cable.
➢ Furnish and install 4 nos. 160mm duct banks, including the conduits, 95mm 2 counter poise wire, concrete, warning tape, excavation, filling, steel bar and civil works and all other necessary works.