Client Abu Dhabi Airports Company
Status Completed
Category Airport Projects
Location Abu Dhabi
Duration 20 months

➢ Complete rehabilitation of the south runway 13R-31L and new taxiways in between threshold 13R and the existing cross taxiways G and H.
➢ Complete new Airfield Ground Lighting (AGL) system which will be connected to the existing AGL Infrastructure and substations where new CCRs will be installed as required. Complete AGL systems for the new taxiways which will be a part of the new Low Visibility routing from the north runway 13L-31R to the airside infrastructure (taxiways and parking aprons) in the South.
➢ Complete runway strip (up to 160m from the centerline of the runway in both north and south directions) will be re-graded and provided with a surface protection layer.
➢ New drainage line located within the northern strip (east of existing cross taxiways G and H) and new drainage system within runway. Complete drainage system for the west area and a drainage system south of runway.
➢ Runway pavement rehabilitation for all existing taxiways within the Runway and Runway widening. New crash road between the runway and taxiways.
➢ Replacement with new cabling, transformer, addressable control units and CCRs applicable to the existing AGL substation and all existing taxiways within the Runway.
➢ Storm water system consists of reinforced concrete and GRP pipes interconnecting the inlet pits which are located at the lowest point in between the runway and taxiways.