Client Ministry of Public Works
Status Completed
Category Road and Bridge Projects
Location Fujairah
Duration 11 months

➢ Reconstruction of the pavement layers for the last part of Masafi- Fujairah Road (approximately 8.640 km) matching with the previously upgraded section of the road up to Al-Nijimat Roundabout in the Western outskirts of Fujairah. Well maintenance works and development for the remain Masafi- Fujairah Road if needed till Masafi Roundabout.
➢ Construction of 2 new Roundabouts along the road, and establishment of the 3 new traffic signals on the road to a pedestrian crossing. Installation of traffic signal controllers, traffic signal lights and construct of manholes, chambers, adjusting cover levels of chambers etc.
➢ New single carriage way 2.7 km long and 4.00m width with 2.50m shoulder for each direction starts from Masafi- Fujairah road with a new Roundabout( Yabsa R/A ) and ends at Dubai Fujairah Road.
➢ Extension of existing culvert and maintenance. Installation of guardrails and concrete vehicle barriers.
➢ Construction of granular and asphaltic pavement layers. Installation of road furniture, inclusive of roads signs, gantries, road markings and services such as water, telephone, gas and etc.
➢ Installation of roadway lighting.
➢ Laying uPVC duct, construction of drainage chambers, trapezoidal ditch etc. and laying uPVC duct for Etisalat works.
➢ Provide protection for existing gas main line and sewerage pipe line.


Back to Project Grids