Client Ministry of Public Works
Status Completed
Category Road and Bridge Projects
Location Umm Al Quwain
Duration 7 months

➢ Comprises of 4 leg elliptical Round, lighting, traffic signs, road markings, safety barriers and other road appurtenances.
➢ Relocate the existing utilities such as Water, Electricity, Etisalat, Du, Military fibre optic cable, Irrigation, gas and construction the new services line as per specification and standards.
➢ Protection of existing utilities.
➢ Works for FEWA – Water Division
- Removal of Existing Water pipes
- Removal of existing valves and chambers
- Precast reinforced concrete protection slabs placed over existing pipelines, including excavation, back filling and bitumen paint as per FEWA specification.
- Supply, lay and joint HDPE PN16 SDR11 pipeline in trench by butt fusion and electro fusion welding including earthworks, special joints, sand bed and surround, testing and commissioning, marker posts and detectable warning tape.
- Supply and install valves including extension spindles.
➢ Works for FEWA – Electrical Division
- Removal of Existing Substation
- Removal of Existing Columns, Feeder Pillar and Cables
- Relocation of Existing Cables
➢ Works for Etisalat
- Remove Redundant Ducts. Excavate and remove D54 ducts and surrounds and cart to approved tip including backfilling of voids.
- Removal of Existing Manholes/Chambers, Joint Boxes and telephone booth. Demolish, Breakout and remove to approved tip existing manholes/chambers including backfilling of voids and reinstatement.
➢ Works for Du
- Remove Redundant Ducts. Excavate and remove D54 ducts and surrounds and cart to approved tip including backfilling of voids.
- Removal of Existing Manholes/ Chambers. Demolish, breakout and remove to approved tip existing manholes/chambers including backfilling of voids, reinstatement etc.
➢ Irrigation Works , Military Fiber Optic Cable Works and Gas Pipeline Works